Licensed & Insured Deck Contractor

Composite Deck Replacement in Bergen & Passaic County

Re-decking a sound frame or a full rebuild — we probe the old deck, tell you which path applies, and file the right paperwork for that path.

25
Towns served
11+
Years building decks
5-Year
Workmanship warranty
Free
Re-deck or rebuild verdicts

Composite Deck Replacement in Bergen & Passaic County

Taking a wood deck to composite is the core of what we do across Bergen and Passaic County, and which of two methods applies is a real decision, not a sales pitch. A sound frame gets re-decked; a frame that fails our probe gets rebuilt from the footings — and which one you get changes your township paperwork more than it changes the crew.

We probe the frame before we recommend either path, because the call between a re-deck and a rebuild rests on real, checkable conditions at the ledger, the posts and the joists, not on what's easier to sell. Whichever path applies, a pre-1978 painted deck changes the teardown itself, and any railing or stairs that come with the job get built to today's numbers. The step-by-step for a from-scratch build is on Composite Deck Installation; the board and warranty comparison across makers is on Composite Decks.

11+Years Experience
500+Projects Completed
Composite Deck Replacement project by House of Decks

What Happens at the Free Estimate

No pressure and no deposit — just an hour, a tape measure, and a written number you can hold anyone else's quote against.

We measure and look underneath
Grade, drainage, access for a truck, and how the existing structure was built. That is what makes a number real rather than a guess over the phone.
You get it in writing
Materials, dimensions and a timeline on paper, so you can compare our quote against anyone else's on the same terms.
About an hour, at your convenience
Evenings and Saturdays included. We work two counties, so we are rarely more than half an hour away.
No obligation, no deposit to quote
The estimate is free and yours to keep. Nothing is owed if you decide not to build, or decide to build later.

Prefer to talk it through first? Call (201) 321-2990.

How It Works

Our proven process from first call to final walkthrough.

1

Free frame probe

We check the ledger, post bases and joist crowns for rot or movement, and measure the existing joist spacing against composite's 16-inch rule.

2

The re-deck or rebuild verdict

A sound frame gets a re-deck, filed as ordinary maintenance. A frame that fails the probe gets a full rebuild, filed as new construction. We tell you which and why.

3

Permit path, or notice

A re-deck typically needs no permit; a full rebuild needs drawings, filing and inspections. We handle whichever applies, and check with your township when the call is close.

4

Demolition, where it applies

A full rebuild starts with removing the old structure — under EPA lead-safe rules first, if the home was built before 1978 and the old deck is painted.

5

New boards, registered warranty

Composite boards go down to the manufacturer's spec on either path, and the warranty is registered in your name at handover.

What Composite Deck Replacement Covers

Typically a re-deck runs days; a full rebuild runs the same timeline as a new composite installation..

Re-decking a sound frame

New composite boards and fascia on an existing frame that passes our rot and spacing probe — ordinary maintenance under New Jersey's rule, in most cases no permit.

  • Ledger, post and joist probe
  • Joist spacing correction where needed
  • New composite boards, fascia and fasteners

Full tear-out and rebuild

The old structure removed and a new frame built from the footings, permitted as new construction, composite boards to follow.

  • EPA-compliant demolition where the deck is painted
  • Frost-depth footings and new framing
  • Composite boards to manufacturer spec

Railing and stair replacement to current code

Railings and stairs brought up to New Jersey's current guard and stair numbers, whichever path the deck field takes.

  • 36-inch guard height, 4-inch sphere rule
  • Riser and tread at NJ's 8 1/4 / 9-inch numbers
  • Composite rail systems matched to your boards

Two paths

Re-Deck or Full Replacement — Which One Applies

The same switch, wood to composite, files two different ways depending on what's happening to the frame.

  • Re-decking a sound frame

    New boards on joists that are already there and pass inspection. Under N.J.A.C. 5:23-2.7(c)1.xiii, replacing any part of a deck that doesn't carry a roof, in materials 'identical to, or closely similar to' what's there, is ordinary maintenance — no permit, no notice.

  • The 'closely similar' question

    Neither the regulation nor the state's own rule-adoption response defines 'closely similar,' and whether composite over a wood frame qualifies is the local construction official's call, not ours. We ask the township before we start rather than assume.

  • Full replacement is new construction

    'Deck' doesn't appear in N.J.A.C. 5:23-2.17A's minor-work list, which names only the total replacement of a porch or stoop. A full rebuild — new frame, new footings, new ledger — needs a complete permit application, not a notice.

  • What a full permit requires

    At least two sets of drawings, sealed unless the homeowner-affidavit exception applies, footing and final inspections, and footings at New Jersey's frost depth — 36 inches for Bergen and Passaic County's North Jersey zone.

  • Ordinary maintenance still follows code

    No permit doesn't mean no rules. The state's own adoption notes that ordinary-maintenance work still has to follow the Rehabilitation Subcode's requirements — it's exempt from filing with the township, not from being done right.

  • One job, either way

    Whichever path your frame earns, the same crew handles it start to finish — we don't hand a straightforward re-deck to one team and a full rebuild to another, and the estimate tells you which one you're getting before work starts.

The frame test

What Decides Which Path You Get

Evidence, not a guess. This is what we check before we recommend either path.

  • Rot probe at the ledger

    The connection to the house carries the deck's load and is the one that fails suddenly, not gradually. Soft wood at the ledger moves the verdict toward a full rebuild before anything else on the deck does.

  • Post bases and footings

    We check for movement, not just rot — a footing that has heaved or a post base that has shifted off it is a framing problem no amount of new decking on top can fix.

  • Joist crowns and deflection

    Joists that already bounce underfoot, or crown unevenly under a straightedge, aren't a foundation a warranty-backed composite board should sit on — regardless of what the permit rule technically allows us to skip.

  • Existing joist spacing versus the 16-inch rule

    Composite decking is specified at 16 inches on-center for boards run straight to the joists. A frame built wider than that for old wood decking needs added joists before it can carry composite to the manufacturer's spec.

  • Blocking condition

    Manufacturers call for solid blocking between joists at 4- to 6-foot intervals. A frame built without it — common on older wood decks — is missing a step the re-deck has to add back before boards go down.

  • The verdict, in writing

    We give you the probe results and which path they support before any board is ordered — the same straight verdict we'd give on a wood deck between repair and full replacement.

EPA Lead Rules and What They Mean for a Painted Deck

A pre-1978 home changes the demolition plan before it changes anything else.

Pre-1978 homes trigger federal rules
EPA's Renovation, Repair and Painting rule covers any paid work that disturbs painted surfaces in a home built before 1978 — any room, any surface, no exception for a deck simply because it's outdoors.
Demolition has no minor-repair exception
EPA's minor-repair carve-out — 6 square feet indoors, 20 outdoors — explicitly excludes any work that involves demolishing painted surfaces. So tearing out a painted deck is regulated work no matter how small the deck actually is.
Certified firm, trained crew
RRP work requires an EPA-certified firm and a certified renovator either doing the work or training whoever is. That certification, not the deck's square footage, is what makes the demolition legal to perform.
Containment on site
Lead-safe work practices mean containing dust and debris at the work area itself, not sweeping it into the yard afterward — standard practice on any pre-1978 home, not an add-on we charge extra for.
It applies to demolition, not to composite
The rule governs disturbing the old painted wood on the way out. The new composite boards going in afterward aren't a lead concern of any kind — the exposure risk ends with the old deck.
We ask the home's age up front
A pre-1978 build date changes the demolition plan before we ever quote the job, which is why it's one of the first questions we ask at the estimate, not a surprise on invoice day.

What comes with it

Railings, Stairs and the Warranty You're Inheriting

Two more things a wood-to-composite switch touches, on either path.

  • Railings and stairs come up to today's numbers

    Whichever path applies to the deck field, any railing or stairs included in the job are built to New Jersey's current numbers: 36-inch guard height with the 4-inch sphere rule, and stairs at the state's amended 8 1/4-inch maximum riser and 9-inch minimum tread.

  • Trex warranty transfer

    If you're inheriting an existing Trex deck rather than building new, Trex's warranty can be transferred once, within five years of the original purchase — worth checking before you assume coverage follows the house.

  • Deckorators doesn't transfer

    Deckorators' warranty is explicitly non-assignable to a subsequent owner, and a claim can't be processed without the product being registered — two reasons to confirm exactly what you have before relying on it.

  • A re-deck gets a warranty registered fresh

    New composite boards on an existing frame still carry the manufacturer's full board warranty from this purchase date. We register it in your name at handover, the same as we would on a new build.

  • The build sequence lives elsewhere

    For the step-by-step of how a composite deck actually goes together — joist spacing, gapping, fastener systems — see Composite Deck Installation. This page is about which path your existing deck earns.

  • Board and warranty comparison

    Choosing between makers and tiers, and exactly what voids each warranty, is the full subject of Composite Decks. Here we're deciding whether you're re-decking or rebuilding, not which board to buy.

Ready to Get Started?

Get a free, no-obligation in-home estimate. We'll walk your property, discuss your vision, and provide a detailed quote, all at no cost.

What Our Customers Say

Real reviews from homeowners in your area.

Oct 2026

“House of Decks LLC built our new porch, and the crew arrived when they said they would. They got right to work and kept things moving without making the job feel rushed. The construction was done carefully, and the finished porch has a neat, solid look that works well for our home. I’m very happy with the work. I’d call them again for another project”

Photo of Carl Miller

Carl Miller

Composite Deck Replacement

Oct 2026

“House of Decks LLC built our new porch, and I’d hire them again. During the work, the crew answered my questions and made a helpful adjustment when I pointed out something I wanted handled differently. They were respectful around the house and kept the area organized. The porch has a sturdy, finished look without feeling too elaborate. I’m very satisfied with how everything turned out.”

Photo of Gast 20

Gast 20

Composite Deck Replacement

Oct 2026

“They did a great job building our new fence and were a really good crew to work with”

Photo of Olivia

Olivia

Composite Deck Replacement

Oct 2026

“House of Decks LLC replaced our old deck. I wanted a sturdy space that looked neat and would be comfortable to use. The finished deck is solid and clean, and the simple look works well behind the house. Once the crew was done, there was very little for us to tidy afterward. I’m really pleased with the result. This was a hardworking, dependable crew to have on the job”

Photo of Jeremy Lawrence

Jeremy Lawrence

Composite Deck Replacement

Oct 2026

“The new elevated deck and stairs came out even better than I expected. Before work started, Stiljano clearly explained what they planned to do, and he answered my questions so I knew what was happening. The crew was respectful around the house and pleasant to have around while they worked. They worked carefully, and the finished gray decking with white railings looks sharp beside the brick house. The stairs feel solid, and the whole deck has a clean, finished look. I’d call Stiljano and the crew again when I have another project.”

Photo of Raquel

Raquel

Composite Deck Replacement

Oct 2026

“I wanted a contractor who would listen to what we had in mind and make sensible suggestions for our raised deck installation. The team did that without turning the decision into a sales pitch. They explained the available choices in plain language, which made it easier for me to choose the right direction. I also liked that they paid attention to the details we cared about instead of treating the job like a routine order. The finished gray deck with white railing looks clean and suits our house well, but their attitude was what convinced me that choosing them was the right decision in the end.”

Photo of carol ford

carol ford

Composite Deck Replacement

Sep 2026

“Found these guys online while looking for someone to build our raised deck. The first conversation went well, so we decided to go ahead with them. Their schedule worked with ours, and we didn’t have to be home for every visit, which helped a lot. The crew was polite and treated our home respectfully while they were here. We’re really happy with how the deck turned out. It looks good against the house without being overdone. From that first conversation through the installation, they were easy to deal with. Glad we found them, and a big thank you to the crew for the work they put in”

Photo of Besati Lionurs

Besati Lionurs

Composite Deck Replacement

Sep 2026

“Very happy with the quality of work and punctuality. Stiljano was a pleasure to work with. Definitely recommend to anyone in need of a deck contractor”

Photo of Embro Dhuli

Embro Dhuli

Composite Deck Replacement

Sep 2026

“Seeing the finished deck was a great feeling. House of Decks LLC built a raised deck with multiple levels, stairs and railings that give the side of our home a completely different look. The white posts and black balusters stand out against the brown decking. The space feels much more inviting now, and that’s what I’d tell anyone considering this kind of work”

Photo of Stacy Williams

Stacy Williams

Composite Deck Replacement

Sep 2026

“The work done by House of Decks LLC was super when it came to replacing our old deck. Stiljano and his team is a very professional person who communicates well and explains everything from the start. His crew worked fast and left the area clean after all the small details were taken care of.The work done looks wonderful, and the deck is really strong. It was fair price for what we got, and everything went according to our plans. I definitely recommend House of Decks LLC for a deck replacement”

Photo of Nicole Gomez

Nicole Gomez

Composite Deck Replacement

Sep 2026

“House of Decks LLC performed a perfect installation of a new deck at our residence in Franklin Lakes, NJ. Both Stiljano and his crew were highly responsible and professional in their work. All aspects of their service were explained to us in detail, including the progress of the work and the cost of services, which was quite reasonable and without any surprises. The new deck made of composite material and white railings looks perfect, and everything seems sturdy and quality. Our backyard is transformed into a new space after that.”

Photo of Shelia Jones

Shelia Jones

Composite Deck Replacement

Sep 2026

“Working with Stiljano and his crew was an absolute pleasure. They removed our old wood deck and installed our new one. They did a masterful job with great attention to detail. It looks amazing! We highly recommend House of Decks.”

Photo of Teresa Grillo

Teresa Grillo

Composite Deck Replacement

Sep 2026

“We had House of Decks LLC build our new deck in Fair Lawn and we’re really happy with how it turned out. The deck looks clean and solid, and the white railings with the black balusters came out really nice. The stairs and finishing details were done carefully, and everything feels sturdy. The crew did a great job from start to finish. Definitely recommend House of Decks LLC for anyone looking to build or replace a deck in the Fair Lawn area.”

Photo of Joshua Samford

Joshua Samford

Composite Deck Replacement

Sep 2026

“They replaced the floor and railing on my deck. Very professional and quality workmanship. I would definitely recommend to anyone who wants to update their deck”

Photo of Aurel Dhuli

Aurel Dhuli

Composite Deck Replacement

Sep 2026

“Our old outdoor space wasn’t working well for us, so we decided to have a composite deck built in Wayne. The finished deck gives us a much nicer place to spend time, and I’m very happy with how it turned out. The crew did a great job.”

Photo of Dana Golliday

Dana Golliday

Composite Deck Replacement

Aug 2026

“House of Decks LLC has done a wonderful job with our new deck installation. The team was relaxed, on time, and worked really well to leave little clean up at all. The end result is a sturdy and beautiful deck that I am truly happy with”

Photo of Orlando Valdez

Orlando Valdez

Composite Deck Replacement

Aug 2026

“The job that was done by House of Decks LLC for our new deck was really good. They started by removing the old deck and then assisted us in choosing a layout and material options, explaining everything before beginning the process. Their workers arrived on schedule, were fast at working and kept our backyard clean. The end result is a very solid deck with straight boards and railings, which has greatly improved the backyard area. We are really pleased with their work and would recommend them for any deck installation. Thank you guys!”

Photo of Devonte King

Devonte King

Composite Deck Replacement

Mar 2026

“Great communication, fast install, and fair price. 10/10 overall great experience thank you guys”

Photo of Abbas Salem

Abbas Salem

Composite Deck Replacement

Mar 2026

“Did a great job from start to finish extremely professional and worth every dollar. The best craftsmanship and professionalism would highly recommend”

Photo of Noor Eljdid

Noor Eljdid

Composite Deck Replacement

Mar 2026

“The absolute best decking company in the area hard workers and honest pricing. Agreed on a price and they went straight to work the crew was extremely pleasant and work oriented and the results were out of this world thank you guys”

Photo of Hunter The Game God

Hunter The Game God

Composite Deck Replacement

Mar 2026

“House of Decks was friendly, efficient, extremely professional and had excellent craftsman. I was very pleased with their work and highly recommended them. They went above and beyond by helping move my mahogany wood nightstands when it was shipped my place. Thank for the help, 5 stars!”

Photo of Leo Acosta

Leo Acosta

Composite Deck Replacement

Feb 2026

“Contacted them via phone they were very communicative decides to go ahead and pull the trigger ! Bed decision of my life My new deck is absolutely amazing the craftsmanship is outstanding and the price was very fair ! Thank you guys for your hard work”

Photo of Ilias Elhaouss

Ilias Elhaouss

Composite Deck Replacement

Feb 2026

“Choosing House of decks was the right decision !! Assessed the structural issues carefully and rebuilt my deck stronger and more attractive than before ! Couldn’t resist the affordable price and the attention to details ! Thank you guys”

Photo of Abraham Yassine

Abraham Yassine

Composite Deck Replacement

Feb 2026

“It was an absolute pleasure to work with stiljano and his crew ! Contacted them about a deck demolition and to build me a new deck ! They were quick to reply and gave me a fair price that I couldn’t find anywhere ! I am so impressed w the results ! Thank you guys for your hard work”

Photo of Ke Xu

Ke Xu

Composite Deck Replacement

Frequently Asked Questions

The questions homeowners ask us at almost every estimate.

Can I switch to composite without a permit?

Often, yes. Replacing boards on a frame that's structurally sound is ordinary maintenance under N.J.A.C. 5:23-2.7(c)1.xiii as long as the new material is 'identical to, or closely similar to' what's there — no permit, no notice. Whether composite over wood counts as 'closely similar' isn't defined in the regulation, so it's genuinely the local construction official's call. We check with your township before we start rather than assume the answer.

When does a composite switch need a full permit?

When the frame itself is being rebuilt. 'Deck' doesn't appear in New Jersey's minor-work list, which covers only the total replacement of a porch or stoop — so new footings, a new ledger or a new frame is treated as new construction, with two sets of drawings, footing and final inspections, and frost-depth footings.

How do you decide between re-decking and a full rebuild?

We probe first: the ledger, post bases and joist crowns for rot or movement, and check whether the existing joist spacing already meets composite's 16-inch rule. A sound, correctly-spaced frame gets re-decked. Rot at the ledger, heaved footings or wide joist spacing move the verdict to a full rebuild, and we give you that verdict before ordering material.

My house was built before 1978 — does that matter?

Yes, if the old deck is painted. Demolishing painted surfaces on a home built before 1978 is regulated under EPA's lead-safe renovation rule regardless of the deck's size — the rule's minor-repair exception explicitly does not cover demolition. We're an EPA-certified firm and handle that demolition under containment, not as an afterthought.

Does my old warranty transfer to me?

Depends on the brand. Trex's warranty can be transferred once, within five years of the original purchase. Deckorators' warranty is explicitly non-assignable and can't be claimed without the product being registered. We check what you actually have before you rely on it, and register fresh coverage on any new boards we install.

Will the joist spacing under my old deck work for composite?

Only if it's already close. Composite decking wants joists at 16 inches on-center for boards run straight, tighter for a diagonal layout. A frame built to old wood-decking spacing is often wider than that, which means added joists before composite goes down — one of the things the frame probe checks.

Do you handle the full build from footings, too?

Yes, when the probe points to a full rebuild rather than a re-deck. The footings-to-boards sequence, joist spacing, gapping and fastener systems for a from-scratch composite build are covered in full on Composite Deck Installation.

How is this different from Deck Replacement?

Deck Replacement covers rebuilding a deck in general, wood included. This page is specifically about taking an existing deck to composite — either by re-decking a sound frame or by a full rebuild — and the New Jersey permit rules unique to that switch.

Free Estimate

Get the Re-Deck or Rebuild Verdict

We probe the existing frame and tell you which path applies — and whether it needs a permit — before you commit to either one.

  • CheckmarkNo obligation, completely free
  • CheckmarkWe come to you for an in-home consultation
  • CheckmarkGet your estimate within 24 hours

Get the Re-Deck or Rebuild Verdict

Fastest ballpark: text a photo of your project to (201) 321-2990