Licensed & Insured Deck Contractor

Composite Deck Installation in Bergen & Passaic County

A new composite deck built to New Jersey's 2024 code and to the manufacturer's own joist, gapping and fastener spec — footings to a registered warranty.

11+
Years installing composite
25
Towns served
5-Year
Workmanship warranty
Free
In-home estimates

Composite Deck Installation in Bergen & Passaic County

House of Decks builds new composite decks across Bergen and Passaic County, footings to a registered manufacturer warranty. What makes this build different is that two systems govern it at once — the code New Jersey enforces and the spec the board maker requires — and they have to agree with each other, not compete: New Jersey's own deck section hands composite joist spacing straight to the manufacturer, so following the brand's spec is not optional trim, it's the inspection and the warranty both.

New Jersey switched code editions this year, and the numbers that changed are exactly the ones an inspector checks at final — footings, ledger, guards and stairs. The board maker's own instructions add a second set of numbers on top, covering joist spacing, gapping and fasteners, and getting either set wrong costs you the same thing: a failed inspection or a denied warranty claim. Which board and tier to buy is a separate decision — see Composite Decks for the full comparison.

11+Years Experience
500+Projects Completed
Composite Deck Installation project by House of Decks

What Happens at the Free Estimate

No pressure and no deposit — just an hour, a tape measure, and a written number you can hold anyone else's quote against.

We measure and look underneath
Grade, drainage, access for a truck, and how the existing structure was built. That is what makes a number real rather than a guess over the phone.
You get it in writing
Materials, dimensions and a timeline on paper, so you can compare our quote against anyone else's on the same terms.
About an hour, at your convenience
Evenings and Saturdays included. We work two counties, so we are rarely more than half an hour away.
No obligation, no deposit to quote
The estimate is free and yours to keep. Nothing is owed if you decide not to build, or decide to build later.

Prefer to talk it through first? Call (201) 321-2990.

How It Works

Our proven process from first call to final walkthrough.

1

Free in-home estimate

We measure the site, check where Low-E glass or full sun hits the deck, and walk you through board lines and tiers in your own light. You leave with a written scope.

2

Board and tier selection

Samples on your actual deck, with the product warranty and the fade-and-stain term written down side by side for two lines. See Composite Decks for the full comparison.

3

Permit and drawings

We prepare the sealed drawings New Jersey requires, file with your township, and confirm setbacks before material is ordered.

4

Footings, frame and ledger

Frost-depth footings, a through-bolted and flashed ledger, and joists set to the spacing your chosen board requires — inspected before any concrete is covered.

5

Boards, fasteners and final inspection

Decking goes down with the hidden fastener system your brand specifies, gapped to the day's temperature, then walked with you before the final inspection and warranty registration.

What Composite Deck Installation Covers

Typically one to three weeks on site once permitted, footings to final board..

New composite deck

Footings to final board, one crew, built to the manufacturer's joist spacing and fastener spec from the first piece of lumber.

  • Frost-depth footings and framing
  • Manufacturer-spec joist spacing
  • Hidden fastener installation
  • Warranty registration

Multi-level or elevated composite deck

Multiple levels or a deck raised well above grade, with engineered posts, bracing and beams sized to the height, not just the footprint.

  • Height-rated posts and bracing
  • Level layout planned around use
  • Stair runs between levels

Composite stairs and railing systems

Stair and railing systems built to New Jersey's amended riser, tread and guard numbers, in a composite rail system matched to your boards.

  • Riser and tread at NJ's 8 1/4 / 9-inch numbers
  • 36-inch guard height, 4-inch sphere rule
  • Composite rail and baluster systems

Code

Built to the 2024 New Jersey Code

New Jersey switched code editions on August 17, 2026. These are the numbers that changed and the ones that didn't.

  • IRC/2024 New Jersey edition

    New Jersey adopted the IRC/2024 New Jersey edition on August 17, 2026, with the usual six-month grace period letting an application already filed be reviewed under the outgoing 2021 edition. The switch renumbers Chapter 3 — stairs move from R311 to R318, guards from R312 to R321 — while deck framing stays under R507 in both editions.

  • Footings at New Jersey's frost depth

    R507.3.3 requires an attached deck's footings to go below the frost line New Jersey sets for its zone. Bergen and Passaic County sit in the North Jersey zone, where the amendment sets that line at 36 inches. Footing width and thickness are sized separately, off the tributary area each one carries and the soil's bearing capacity.

  • Ledger bolted, never toenailed

    R507.8 forbids a toenailed ledger outright — if a positive connection to the house can't be verified, the deck must be self-supporting instead. R507.9.1 sets a minimum 2x8 treated ledger, through-bolted or lag-screwed per Table R507.9.1.3 with staggered fasteners, flashed 2 inches up the wall and 4 inches out from the ledger face.

  • Lateral connection hardware

    R507.9.2 ties the deck to the house against racking with hold-down tension devices: two rated to 1,500 pounds within 24 inches of each end, or four rated to 750 pounds. It's hardware most homeowners never see and every inspector checks.

  • Guards and stairs at New Jersey's numbers

    Guards under R321.1 are required once the walking surface sits more than 30 inches above grade: 36 inches high, with a 4-inch sphere rule. Stairs under R318.7 carry New Jersey's amended figures — 8 1/4-inch maximum riser and 9-inch minimum tread, not the model code's 7 3/4 and 10.

  • Stair guards and handrails

    The 4-inch sphere rule tightens to 4-3/8 inches at a stair guard, and handrails are required on at least one side of any flight with four or more risers — two more figures an inspector checks at final.

  • Permit, drawings and the seal

    N.J.A.C. 5:23-2.14 requires a permit for a new deck, and 5:23-2.15 requires at least two sets of drawings sealed by a registered architect or licensed engineer on every sheet. The one exception is a homeowner who drew their own plans for their own private residence, filed with a signed affidavit.

Manufacturer spec

Built to the Board's Own Installation Spec

The code defers composite joist spacing to the manufacturer's own instructions. These are the numbers we build to, brand by brand.

  • Joist spacing sets the frame

    Composite boards are ASTM D7032-tested and labeled under R507.2.2, and the code defers their joist spacing to the manufacturer's own instructions. Trex, TimberTech and Fiberon each specify 16 inches on-center for boards run straight to the joists, tightened to 12 inches for a diagonal layout.

  • Gapping by brand and by temperature

    Trex sets a 3/16-inch minimum width-to-width gap and an end gap of 1/8 inch above 40°F, 3/16 below. TimberTech composite runs 1/8 to 3/16 inch side gaps with butt-joint gaps stepping from 1/32 inch above 75°F to 3/16 inch at 32°F and below. Fiberon sets a 3/16-inch side gap. We set gaps with a thermometer, not by eye.

  • Hidden fastener systems

    Trex Hideaway, TimberTech CONCEALoc and TOPLoc, Fiberon Phantom — each brand's hidden-fastener system sets its own board gap and goes at every joist, not just where it's convenient. The board you choose decides the fastener; the fastener is not a place to improvise.

  • The fastener clause that voids a warranty

    TimberTech's composite warranty names any fastener not supplied by the manufacturer as an exclusion, and its installation guide says an edge-driven fastener voids coverage outright. Its CONCEALoc chapter is narrower: an alternative fastener doesn't void the warranty by itself, but a decking failure it causes is denied. We install the fastener system the brand you chose specifies.

  • Ventilation and clearance

    Every maker requires air movement underneath. Trex calls for general air circulation and a 1-1/2-inch sleeper minimum over concrete. Fiberon wants open airflow under half the deck's perimeter with 1-1/2 inches clear beneath the joists. TimberTech wants that same clearance wherever airflow is obstructed, plus a slope of 1/2 inch for every 8 feet away from the house.

  • Low-E glass gets a plan before boards

    Reflected sunlight off low-emissivity glass can char or bow Trex boards and can melt, sag or warp TimberTech's. TimberTech's PVC guide tightens joists to 6 to 8 inches on-center for six feet in front of any Low-E door or window within 30 inches of the deck surface.

Product Lines and Warranty Terms

The full comparison is on Composite Decks. This is what governs the build itself, brand by brand.

Trex
Signature and Transcend carry 50-year limited residential warranties, Select is 35, Enhance is 25, and Refuge, Trex's PVC board, is listed at 50 on trex.com. Every one of them is conditioned on installing to Trex's written instructions, gapping included.
TimberTech Advanced PVC
Vintage, Landmark, Harvest, Harvest+ and Solstice are warranted for the lifetime of the product to a residential purchaser, effective for purchases on or after June 12, 2026, with a 50-year fade-and-stain term — 35 years for Solstice.
TimberTech composite
Legacy, Reserve and Terrain are 30 years residential, prorated; Prime+, Prime and Premier are 25. Terrain, Prime and Prime+ may only be used as a stair-tread veneer over a 2x6 support — not as the structural tread itself.
Fiberon
Concordia Symmetry and Horizon are lifetime on physical integrity with a 50-year fade-and-stain term. Sanctuary runs 40, Good Life Escapes 30, Good Life Weekender 25. Phantom hidden fasteners carry their own 20-year term, separate from the boards'.
Deckorators
Voyage is 50-year structural with 25-year removal-and-replacement cover — the only line here whose maker pays to pull a failed board and install a new one. Vault, Summit, Trailhead, Vista and Venture run 25 to 50 years without that cover.
The full comparison
Warranty tiers, fade math and exactly what voids each one, board by board, is the full subject of Composite Decks. This page is about building correctly to spec once you've already picked the line, not about choosing between makers.

Honest limits

What We Won't Oversell You On

We install a lot of composite. These are the cases where we say so before you buy it.

  • Dark boards run hot

    Trex's own guide says the darker the colour, the hotter the deck will feel; TimberTech's says the same. SunComfortable colours cut heat build-up by up to 35°F against Trex's original boards, but Trex still notes they'll get hot in direct sun on a hot day.

  • Low-E reflection needs a plan

    A wall of low-emissivity glass facing the deck can concentrate reflected sunlight enough to char, discolour or bow the boards. We check your windows before we choose a colour or set final joist spacing near the glass.

  • Cost multiplies on a large footprint

    The warranty tier you pick is also, roughly, the price tier, and on a big deck that gap moves in multiples, not percentages. We quote two lines side by side so you see the step before you commit.

  • Painted looks aren't this material

    Trex's warranty is voided the day paint, solvents or any coating goes on — the cap is the finish, permanently. If you want a surface you recolour over the years, that is Wood Deck Construction, not composite.

  • Stairs cost more per step

    Composite stair stringers run closer than the deck field — 9 to 12 inches on Trex treads depending on line, 12 on Fiberon — so each step carries more frame and labour than the same run in wood.

  • A sound frame isn't automatic

    Building the frame and the boards together here means spacing is never a question on a new install. It is the whole question on an existing deck, which is why that has its own page: Composite Deck Replacement.

Ready to Get Started?

Get a free, no-obligation in-home estimate. We'll walk your property, discuss your vision, and provide a detailed quote, all at no cost.

What Our Customers Say

Real reviews from homeowners in your area.

Oct 2026

“House of Decks LLC built our new porch, and I’d hire them again. During the work, the crew answered my questions and made a helpful adjustment when I pointed out something I wanted handled differently. They were respectful around the house and kept the area organized. The porch has a sturdy, finished look without feeling too elaborate. I’m very satisfied with how everything turned out.”

Photo of Gast 20

Gast 20

Composite Deck Installation

Oct 2026

“They did a great job building our new fence and were a really good crew to work with”

Photo of Olivia

Olivia

Composite Deck Installation

Oct 2026

“House of Decks LLC replaced our old deck. I wanted a sturdy space that looked neat and would be comfortable to use. The finished deck is solid and clean, and the simple look works well behind the house. Once the crew was done, there was very little for us to tidy afterward. I’m really pleased with the result. This was a hardworking, dependable crew to have on the job”

Photo of Jeremy Lawrence

Jeremy Lawrence

Composite Deck Installation

Oct 2026

“The new elevated deck and stairs came out even better than I expected. Before work started, Stiljano clearly explained what they planned to do, and he answered my questions so I knew what was happening. The crew was respectful around the house and pleasant to have around while they worked. They worked carefully, and the finished gray decking with white railings looks sharp beside the brick house. The stairs feel solid, and the whole deck has a clean, finished look. I’d call Stiljano and the crew again when I have another project.”

Photo of Raquel

Raquel

Composite Deck Installation

Oct 2026

“I wanted a contractor who would listen to what we had in mind and make sensible suggestions for our raised deck installation. The team did that without turning the decision into a sales pitch. They explained the available choices in plain language, which made it easier for me to choose the right direction. I also liked that they paid attention to the details we cared about instead of treating the job like a routine order. The finished gray deck with white railing looks clean and suits our house well, but their attitude was what convinced me that choosing them was the right decision in the end.”

Photo of carol ford

carol ford

Composite Deck Installation

Sep 2026

“Found these guys online while looking for someone to build our raised deck. The first conversation went well, so we decided to go ahead with them. Their schedule worked with ours, and we didn’t have to be home for every visit, which helped a lot. The crew was polite and treated our home respectfully while they were here. We’re really happy with how the deck turned out. It looks good against the house without being overdone. From that first conversation through the installation, they were easy to deal with. Glad we found them, and a big thank you to the crew for the work they put in”

Photo of Besati Lionurs

Besati Lionurs

Composite Deck Installation

Sep 2026

“Very happy with the quality of work and punctuality. Stiljano was a pleasure to work with. Definitely recommend to anyone in need of a deck contractor”

Photo of Embro Dhuli

Embro Dhuli

Composite Deck Installation

Sep 2026

“Seeing the finished deck was a great feeling. House of Decks LLC built a raised deck with multiple levels, stairs and railings that give the side of our home a completely different look. The white posts and black balusters stand out against the brown decking. The space feels much more inviting now, and that’s what I’d tell anyone considering this kind of work”

Photo of Stacy Williams

Stacy Williams

Composite Deck Installation

Sep 2026

“The work done by House of Decks LLC was super when it came to replacing our old deck. Stiljano and his team is a very professional person who communicates well and explains everything from the start. His crew worked fast and left the area clean after all the small details were taken care of.The work done looks wonderful, and the deck is really strong. It was fair price for what we got, and everything went according to our plans. I definitely recommend House of Decks LLC for a deck replacement”

Photo of Nicole Gomez

Nicole Gomez

Composite Deck Installation

Sep 2026

“House of Decks LLC performed a perfect installation of a new deck at our residence in Franklin Lakes, NJ. Both Stiljano and his crew were highly responsible and professional in their work. All aspects of their service were explained to us in detail, including the progress of the work and the cost of services, which was quite reasonable and without any surprises. The new deck made of composite material and white railings looks perfect, and everything seems sturdy and quality. Our backyard is transformed into a new space after that.”

Photo of Shelia Jones

Shelia Jones

Composite Deck Installation

Sep 2026

“Working with Stiljano and his crew was an absolute pleasure. They removed our old wood deck and installed our new one. They did a masterful job with great attention to detail. It looks amazing! We highly recommend House of Decks.”

Photo of Teresa Grillo

Teresa Grillo

Composite Deck Installation

Sep 2026

“We had House of Decks LLC build our new deck in Fair Lawn and we’re really happy with how it turned out. The deck looks clean and solid, and the white railings with the black balusters came out really nice. The stairs and finishing details were done carefully, and everything feels sturdy. The crew did a great job from start to finish. Definitely recommend House of Decks LLC for anyone looking to build or replace a deck in the Fair Lawn area.”

Photo of Joshua Samford

Joshua Samford

Composite Deck Installation

Sep 2026

“They replaced the floor and railing on my deck. Very professional and quality workmanship. I would definitely recommend to anyone who wants to update their deck”

Photo of Aurel Dhuli

Aurel Dhuli

Composite Deck Installation

Sep 2026

“Our old outdoor space wasn’t working well for us, so we decided to have a composite deck built in Wayne. The finished deck gives us a much nicer place to spend time, and I’m very happy with how it turned out. The crew did a great job.”

Photo of Dana Golliday

Dana Golliday

Composite Deck Installation

Aug 2026

“House of Decks LLC has done a wonderful job with our new deck installation. The team was relaxed, on time, and worked really well to leave little clean up at all. The end result is a sturdy and beautiful deck that I am truly happy with”

Photo of Orlando Valdez

Orlando Valdez

Composite Deck Installation

Aug 2026

“The job that was done by House of Decks LLC for our new deck was really good. They started by removing the old deck and then assisted us in choosing a layout and material options, explaining everything before beginning the process. Their workers arrived on schedule, were fast at working and kept our backyard clean. The end result is a very solid deck with straight boards and railings, which has greatly improved the backyard area. We are really pleased with their work and would recommend them for any deck installation. Thank you guys!”

Photo of Devonte King

Devonte King

Composite Deck Installation

Mar 2026

“Great communication, fast install, and fair price. 10/10 overall great experience thank you guys”

Photo of Abbas Salem

Abbas Salem

Composite Deck Installation

Mar 2026

“Did a great job from start to finish extremely professional and worth every dollar. The best craftsmanship and professionalism would highly recommend”

Photo of Noor Eljdid

Noor Eljdid

Composite Deck Installation

Mar 2026

“The absolute best decking company in the area hard workers and honest pricing. Agreed on a price and they went straight to work the crew was extremely pleasant and work oriented and the results were out of this world thank you guys”

Photo of Hunter The Game God

Hunter The Game God

Composite Deck Installation

Mar 2026

“House of Decks was friendly, efficient, extremely professional and had excellent craftsman. I was very pleased with their work and highly recommended them. They went above and beyond by helping move my mahogany wood nightstands when it was shipped my place. Thank for the help, 5 stars!”

Photo of Leo Acosta

Leo Acosta

Composite Deck Installation

Feb 2026

“Contacted them via phone they were very communicative decides to go ahead and pull the trigger ! Bed decision of my life My new deck is absolutely amazing the craftsmanship is outstanding and the price was very fair ! Thank you guys for your hard work”

Photo of Ilias Elhaouss

Ilias Elhaouss

Composite Deck Installation

Feb 2026

“Choosing House of decks was the right decision !! Assessed the structural issues carefully and rebuilt my deck stronger and more attractive than before ! Couldn’t resist the affordable price and the attention to details ! Thank you guys”

Photo of Abraham Yassine

Abraham Yassine

Composite Deck Installation

Feb 2026

“It was an absolute pleasure to work with stiljano and his crew ! Contacted them about a deck demolition and to build me a new deck ! They were quick to reply and gave me a fair price that I couldn’t find anywhere ! I am so impressed w the results ! Thank you guys for your hard work”

Photo of Ke Xu

Ke Xu

Composite Deck Installation

Frequently Asked Questions

The questions homeowners ask us at almost every estimate.

Do I need a permit for a new composite deck?

Yes. N.J.A.C. 5:23-2.14 requires a construction permit for building a deck, and 5:23-2.15 requires at least two sets of drawings sealed by a registered architect or licensed engineer on every sheet. The one exception is a homeowner who drew their own plans for their own private residence, filed with a signed affidavit. We prepare the drawings, and where the affidavit route doesn't apply, we bring in a sealed set — either way we file with your township ourselves.

Which code edition applies to my deck?

New Jersey adopted the IRC/2024 New Jersey edition effective August 17, 2026. A complete application already in the pipeline can still be reviewed under the outgoing 2021 edition for six months past that date, under the standard grace-period rule. In practice this mostly matters for numbering — stairs moved from R311 to R318 and guards from R312 to R321 — because the deck-framing numbers under R507 and the amended stair and guard figures stayed the same across the switch.

How deep do the footings go?

Below the frost line New Jersey sets for your zone. Bergen and Passaic County sit in the state's North Jersey zone, where the code amendment sets the Table R301.2 frost line at 36 inches — deeper than the 30 inches South Jersey gets. Footing width and thickness are then sized separately, off the tributary area each footing carries and the soil's bearing capacity, per Table R507.3.1.

What joist spacing does composite decking need?

Tighter than wood. Composite boards are tested and labeled under ASTM D7032, and the code defers their joist spacing to the manufacturer's own instructions. Trex, TimberTech and Fiberon each specify 16 inches on-center for boards run straight to the joists and 12 inches for a diagonal layout — get it wrong and the board's own warranty is one of the things at risk, not just the deflection underfoot.

What are New Jersey's stair numbers, and why do they matter?

New Jersey amends the model code's stair figures: the maximum riser height is 8 1/4 inches, not the model code's 7 3/4, and the minimum tread depth is 9 inches, not 10. A competitor quoting the national numbers is quoting the wrong code for this state. We build every stair run to the New Jersey figures, which the local inspector checks at final.

Can any fastener be used to install composite boards?

No — check the brand's own paperwork first. TimberTech's composite warranty names any fastener not supplied by the manufacturer as an exclusion, and its installation guide states outright that an edge-driven fastener voids coverage. Its CONCEALoc chapter is narrower: using an alternative fastener doesn't void the warranty by itself, but a failure it causes is denied. We install with the fastener system the brand you chose specifies, at every joist.

Does a composite deck need special ventilation?

Yes — every maker requires air movement underneath. Trex calls for general air circulation and a minimum 1-1/2 inch sleeper over concrete. Fiberon wants open airflow under half the deck's perimeter with 1-1/2 inches clear beneath the joists. TimberTech wants that same 1-1/2 inch clearance wherever airflow is obstructed, plus a slope of 1/2 inch for every 8 feet running away from the house.

Will dark composite boards get hot?

Yes, and both major makers say so in their own literature: Trex states the darker the colour, the hotter the deck will feel, and TimberTech says the same. Trex's SunComfortable colours cut heat build-up by up to 35°F against its original boards, but Trex still notes they'll get hot in direct sun on a hot day. For a south-facing or poolside deck, we steer you to a lighter colour at the estimate.

Free Estimate

Price a New Composite Deck

Free in-home estimate. We measure, check your Low-E exposure, and quote board and fastener spec in writing.

  • CheckmarkNo obligation, completely free
  • CheckmarkWe come to you for an in-home consultation
  • CheckmarkGet your estimate within 24 hours

Price a New Composite Deck

Fastest ballpark: text a photo of your project to (201) 321-2990